  1. Circular interior construction2022/23Constructionmaterials

  2. Layers at a doorway
    Layers at a doorwayTimber, a fibrous board and a filled surface meet within the wall assembly.
  3. At Heap59 in Berlin, I worked on interior and exterior construction in 2022 and 2023, first as a construction intern and then in drywall construction. The work included CRCLR House in Neukölln and nGbK in Mitte.

    My tasks included timber stud walls, service channels made from hardboard and floor assemblies using wood-fibre and straw boards. I levelled sand fill and laid reclaimed floorboards. I also worked with hemp-lime, clay and materials recovered during demolition.

    The photographs follow the work between the open structure and the completed room. The junctions often required the most attention: fitting a new board to an existing wall, levelling an uneven floor and deciding what could be used again.

    About the project
  4. CRCLR House, Berlin-Neukölln
    CRCLR House, Berlin-NeuköllnThe existing building and the addition above it.
  5. SubstructureAssemblyBoards and studs
    On siteTimber framing, wall assembly and the fitting of boards, seen at different stages of the work.
  6. Building up the floor
    Building up the floorBoard layers and the junction with the glazing, before the finished surface is laid.
  7. Before completion
    Before completionTimber ceiling, wall surfaces and window junction during fit-out.
  8. The completed room
    The completed roomTimber floorboards and an exposed timber ceiling define the interior.
  9. Floor and daylight
    Floor and daylightA view through the completed interior towards the facade.
  10. Year
    2022/23
    Theme
    Circularity & materials
    My role
    Construction internship followed by work in drywall construction
    Practice
    Heap59 GmbH
    Location
    Berlin
    Context
    CRCLR House and nGbK, Berlin
    Project 11 of 19.Next Mobile Tiny House →

Project index

19 Projects

All projects. Select a column heading to sort.
2026Fritz-Pflaum-Hütte, Design StudyRepair and extensionExisting buildings & craft
2026Charred, Fritz-Pflaum-HütteAdaptive reuse, mountain hutExisting buildings & craft
2026A Quarter for Everyone, GesundbrunnenUrban design, competitionCity & landscape
2025YellowBruckRoadUrban design, conversionCity & landscape
2025/26InnoLith, a hemp-lime building blockMaterials, researchCircularity & materials
2025/26Halensee Goods YardArchitecture, feasibility studyCity & landscape
2025University of Konstanz Mobility HubMobility, campusCity & landscape
2025Unity in Diversity, Deutzer Hafen Block 5Urban design, competitionCity & landscape
2025CommonGroundComputation, web appComputational design & AI
2023Naós, Anchoring Perast’s FutureAdaptive reuse, workshopExisting buildings & craft
2022/23Circular interior constructionConstruction, materialsCircularity & materials
2022Mobile Tiny HouseVisualisation, timber constructionCircularity & materials
2022Stadthaus SiegelHousing, timber constructionCircularity & materials
2021Visual Programming, Reichstag DomeParametric design, GrasshopperComputational design & AI
2021The Whole Earth Catalog ReloadedTheory, researchComputational design & AI
2021Hoch Hinaus! Climbing HallSports, constructionExisting buildings & craft
2021Building Analysis, St. Martin, AachenBuilding analysis, sacred architectureExisting buildings & craft
2020An Urban Neighbourhood at BendplatzUrban design, neighbourhoodCity & landscape
2020The Pottery StudioWorkshop, constructionExisting buildings & craft